KEMPEROL 2K-PUR is a two-component, UV-stable high performance seamless and self-terminating cold fluid-applied polyester reinforced solvent-free. KEMPEROL 2K-PUR Speedshot combined with KEMPEROL 2K-PUR is the ideal solution for all applications where speed is essential. These include balconies. KEMPEROL® 2K-PUR is a solvent-free and odourless, fully reinforced, polyurethane resin-based liquid waterproofing system. It is ideal for use on sustainablility.

Author: Tusho Mauhn
Country: Vietnam
Language: English (Spanish)
Genre: Medical
Published (Last): 8 April 2018
Pages: 114
PDF File Size: 8.24 Mb
ePub File Size: 7.69 Mb
ISBN: 422-6-69888-712-3
Downloads: 50963
Price: Free* [*Free Regsitration Required]
Uploader: Zolor

Manufacturer’s data sheets on each product to be used, including:. In the event the bond strengths are less than the minimum specified, additional substrate preparation and testing is required.

Concrete and Masonry Substrate Leveling and Patching: Application exclusively by trained and approved contractors Solvent-free and odourless Cold-applied liquid polymer Fully reinforced and fully bonded Seamless UV stable Vapour permeable Excellent elasticity and tensile strength Performance: Store and dispose of solvent-based materials, and materials used with solvent-based materials, in accordance with requirements of local authorities having jurisdiction.

Two part solvent and odour free waterproofing membrane. Please note that NBS product guidance is not a pjr for the manufacturer’s literature and it is recommended that Kemper System Ltd be consulted before specifying. Spalls and other deterioration shall be repaired in accordance with the requirements of the Architect and Membrane manufacturer.

Apply waterproofing in a timely manner in conjunction with work of other trades.

California Waterproofing Supply Kemperol 2K-PUR

Note that insulation without coated glass facers requires cover board. Ensure that moisture does not damage any completed section of the new waterproofing system. All defects in the deck or substrate shall be corrected before new waterproofing work commences. Fabric must be left intact at these holes to prevent intrusion of soil, grout, sand, or concrete into the drainage core.

Connect adjacent panels at the longitudinal edge by pulling the filter fabric back to expose the flange. Roofdrain green roof drainage and water storage layer Lindum Turf. Fill cavities with a patching mixture of primer and approved kiln-dried sand in a 1: Fleece shall be cut neatly to fit all flashing conditions without a buildup of multiple fleece layers.

  LIFE IS SWEET IN KUMANSENU PDF

Review structural loading limitations of deck and inspect deck for loss of flatness and for required attachment. Review and finalize schedule related to waterproofing work and verify availability of materials, installer’s personnel, equipment and facilities needed to make progress and avoid delays.

Insert 2 or 5 year installer warranty period as required. At membrane tie-offs, clean in-place membrane with MEK methyl ethyl ketone solvent or acetone once resin has cured. Dead, broken or otherwise damaged overburden materials must be removed and discarded. Notify the membrane manufacturer of job completion and schedule a final inspection date.

Mixing Proportions shall be a ratio of resin to sand at 1: Pavers, tiles, stone ballast, or wood decking shall be installed in accordance with the overburden manufacturer’s current published specifications and recommendations for use in an above-membrane plaza application.

Metal flashings shall be fabricated in accordance with the current recommendations of SMACNA and in accordance with the Manufacturer’s standard drawings. Warranties range from limited materials warranties to limited materials and labor warranties with coverage for insulation, ballast, vegetated overburden and surfacing.

Kemperol 2K-PUR highly permeable roofing membrane

At all fleece lemperol, allow a 2 inches 5 cm overlap for all side joints and a 4 inches 10 cm overlap for all end joints. Prepare flashing substrates as required for application of new waterproofing membrane flashings.

Tour representative areas of waterproofing substrates, inspect and discuss condition of substrate, penetrations and other preparatory work. Install separation mat on top of the finished waterproofing membrane or extruded polystyrene insulation. Apply sealer at the manufacturer’s specified coverage rate to provide a sealed, maintainable surface finish. For non-vehicular expansion joints in excess of 2 inches apply a minimum 8 inch strip of Kemperol membrane onto the primed field substrate on both sides of the joint.

Polyisocyanurate Insulation Cover Board: Some substrates may require additional preparation before applying primer. Evaluate substrate moisture content by:. Go to Supplier website.

If movement is necessary, provide complete protection of affected areas. Flood test shall be of a 24 hour minimum duration, and shall apply a 2 inch water head of over the entire pue area.

  ADKAR SALAT PDF

How can we help? When deciding on the extent of the mock-up, consider all the major different types of work on the project. Hollow-core panels, T-panels, and Twin-T panels shall have kemerol joints between panels and shall be provided with mechanical securement from panel to panel.

Ejot Srbija -specijalista u tehnologiji povezivanja. KEMPEROL 2K PUR

Do not store materials in quantities that exceed design loads, damage substrate materials, hinder installation or drainage. Set in water cut-off mastic and secure to the structural substrate. Should any water penetrate the new waterproofing membrane because of incomplete flashings, the affected area shall be removed and replaced at the Contractor’s expense. Provide a minimum of a 2 inch 5 cm overlap between vertical and horizontal flashing components. Wood nailers are required to match the thickness of insulation and cover board, and are to be secured directly to the structural deck.

Review waterproofing system requirements, Drawings, Specifications and other Contract Documents. Protect building components with tarps or other suitable materials, from soil, stains, or spills at all hoisting points and areas of application.

Protect plantings from damage and provide with sufficient water until entire installation is complete. Click for full image.

KEMPEROL┬« 2K-PUR Liquid Applied Solvent-Free and Odourless Waterproofing – Cold Roof System

Reinforce all transition locations and other potential wear areas with a 4 inch wide membrane strip evenly positioned over the transition prior to installing the exposed flashing layer. Sensitive areas such as schools, public places and food manufacturing plants, Applications that favour the use of the most environmentally friendly products, Floors of boiler, control and plant rooms, Complex detailing, Roofs, Balconies, Terraces, Podiums, Fountains and Gutters.

Test shall be scheduled through the membrane manufacturer a kenperol two weeks prior to the test and completed by an approved testing company. Do not put rolls that are wet, dirty or have damaged ends.